Evidence Base Documents
The following tables set out all of the evidence base documents used to prepare the Local Plan.
Chapter 3: Transforming Barking and Dagenham
Key Evidence Documents |
Date |
---|---|
2020 |
|
2020 |
|
2020 |
|
2019 |
|
2017 |
|
2015 |
Chapter 4: Design
Key Evidence Documents |
Date Produced |
---|---|
2017 |
|
Barking Town Centre Conservation Area Appraisal and Management Plan |
2020 |
Historic England: Tall Buildings Advice Note 4 (Consultation Draft) |
2020 |
2016 |
|
2009 |
Chapter 5: Housing
Key Evidence Documents |
Date Produced |
---|---|
2020 |
|
LBBD Strategic Land Availability Assessment Appendix C.1: |
2020 |
2020 |
|
2020 |
|
2020 |
|
2020 |
Chapter 6: Social Infrastructure
Key Evidence Documents |
Date Produced |
---|---|
2020 |
|
2016 |
|
2017 |
|
2017 |
|
Strategic Assessment of Need - Swimming Pools Provision in London 2017-41 (Sport England) |
2017 |
Strategic Assessment of Need - Sports Hall Provision in London 2017-41 (Sport England) |
2017 |
2018 |
|
LBBD Faith groups and meeting places: Evidence base study |
2017 |
2019 |
|
An Audit of London Burial Provision - A report for the Greater London Authority |
2011 |
Chapter 7: Economy
Key Evidence Documents |
Date Produced |
---|---|
2020 |
|
Barking and Dagenham Retail and Town Centre Study Update and Addendum Report Barking and Dagenham Retail and Town Centre Study Update and Addendum Report |
2019 2020 |
2018 |
|
2020 |
|
2018 |
|
Projections of Demand and Supply for Visitor Accommodation in London |
2017 |
The Value of Workspace (Institute of Public Policy Research) |
2016 |
Chapter 8: Natural Environment
Key Evidence Documents |
Date Produced |
---|---|
2020 |
|
2020 |
|
2019 |
|
2018 |
|
2017 |
|
2016 |
|
2016 |
|
2016 |
|
2016 |
|
2012 |
|
Ecological Assessment of mounded land to the east of Padnall Lake |
2020 |
Chapter 9: Sustainable Infrastructure
Key Evidence Documents |
Date Produced |
---|---|
2018 |
|
2018 |
|
2018 |
|
2018 |
|
LBBD Strategic Flood Risk Assessment L1 & L2 Appendix A: Location of Strategic Development Sites Appendix C: Barking Town Centre Appendix H: Ford Stamping Plant & Beam Park Appendix J: Wantz Industrial Estate Appendix M: Dagenham Leisure Park |
2017 |
2017 |
|
East London Waste Authority (ELWA) Joint Waste Development Plan |
2012 |
Chapter 10: Transport
Key Evidence Documents |
Date Produced |
---|---|
2019 |
|
2020 |
|
2020 |
Chapter 11: Enabling Delivery
Key Evidence Documents |
Date |
---|---|
Preface: LBBD Local Plan Viability Study |
2020 |
Supporting Documents
Supporting Documents |
Date |
---|---|
September 2020 |
|
March 2020 |